前往研报中心>>
CGN Group reverse roadshow takeaways
内容摘要
What is New
We attended CGN Group’s collective reverse roadshow for its four listed subsidiaries in Huizhou, Guangdong province.
The Site Visit
We visited CGN Power (1816.HK, BUY)’s Huizhou Taipingling Nuclear Power Plant. Sited at the Southern China Sea coast, the Huizhou base is planned to host 6 Hualong One reactors. Unit 1&2 were put into commercial operation this April and August respectively, with a fixed tariff of RMB0.4153/kWh for 2026. Both Unit 3&4 started construction in 2025. Unit 5&6 would become the pilot Hualong One 2.0 reactors with simplified designs, and were approved on 31 July this year.
On the construction site, we see more modular design and installation techniques applied for Unit 3 & 4. Started construction in June 2025, Unit 3’s nuclear island and conventional island have advanced smoothly and the dome is expected to be lifted into place in early 2027. In that case, Huizhou Unit 3 will become one of the fastest dome lifting Hualong One reactors based on our analysis of milestone data, showcasing the efficiency gain brought by modular design and engineering.
In the afternoon, we visited the control room of Huizhou 1GW offshore wind farm. The Phase I 250MW was commissioned at end-2021 and enjoys subsidised tariff of RMB0.85/kWh. The Phase II 750MW project adopts 10 units of 8.5MW turbines, 45 units of 12MW units turbine and 9 units of 14MW turbines. With an average unit capex of RMB11,000/kW, Phase II was able to achieve significant unit capex reduction compared to Phase I (~RMB20,000/kW) and reasonable return despite grid-parity tariff. We also visited CGN’s 100MW/100MWh energy storage plant in Huizhou that mainly participates in frequency regulation market in the Guangdong province.
回复 0 条,有 0 人参与

我有话说

禁止发表不文明、攻击性、及法律禁止言语;

还可以输入 140 个字符  
以下网友评论只代表同花顺网友的个人观点,不代表同花顺金融服务网观点。